Project: 2JTP Mine Hoist Application for a Zambian Mining Client
Manufacturer:Hebi Wanfeng Mining Machinery Manufacturing Co., Ltd.
Product Model: 2JTP Series Double-Drum Mine Hoist
Application Site: Copper Ore Mine, Copperbelt Province, Zambia
Project Duration: March 2023 – Present
1. Customer Background & Project Challenges
The client, a leading copper mining enterprise in Zambia (referred to as “Zambia Mining Co.” for confidentiality), operates an underground copper ore mine in the Copperbelt Province—one of Africa’s key mining hubs. Prior to 2023, the mine relied on outdated single-drum hoists installed in 2010, which faced critical issues:
Low Operational Efficiency: The old hoists could only handle 80 tons of ore per hour, failing to meet the mine’s expanded production target of 120 tons/hour.
Poor Environmental Adaptability: High dust levels and temperature fluctuations (35–42°C in summer) in the mine caused frequent downtime of the old equipment.
To address these challenges, Zambia Mining Co. launched a global tender for high-performance . Our 2JTP series stood out among competitors from South Africa and Europe.
2. Product Selection: Why the 2JTP Mine Hoist?
After on-site inspections and technical discussions, the client selected our 2JTP double-drum mine hoist for three core reasons:
2.1 Tailored Performance for Copper Mining
Dual-Drum Design: The 2JTP’s double-drum structure enables simultaneous lifting of ore (main drum) and personnel/equipment (auxiliary drum), increasing operational efficiency by 40% compared to single-drum models. The hoist’s rated load (20 tons per drum) and lifting speed (1.8 m/s) perfectly matched the mine’s 120 tons/hour target.
Energy Efficiency: Equipped with a variable-frequency drive (VFD) system, the 2JTP reduces energy consumption by 22% compared to the client’s old hoists—critical for lowering long-term operational costs in Zambia’s energy market.
2.2 ZMSA-Compliant Safety Features
Multi-Layer Protection: Integrated emergency brakes (electromagnetic and mechanical), overload sensors, and temperature monitoring systems meet strict safety requirements. Since installation, the hoist has achieved zero safety incidents.
Durability in Harsh Conditions: The hoist’s cabinet uses IP54 dust-proof and high-temperature-resistant materials, with key components (e.g., gears, bearings) treated with anti-corrosion coatings—ideal for the mine’s dusty, high-temperature environment.
2.3 Localized Service Support
Our team offered end-to-end localization:
Pre-shipment customization (e.g., adjusting drum length to fit the mine’s existing shaft).
On-site installation by a 5-person technical team (with 2 local engineers trained in advance).
24/7 after-sales support via a local service center in Zambia, ensuring downtime is minimized to <2 hours per month.
The client reported that the 2JTP hoist has not only met but exceeded production targets, contributing to a 15% increase in monthly copper output.
4. Customer Testimonial
Operations Director of Zambia Mining Co., commented:
“Choosing Wanfeng mining’s 2JTP hoist was a game-changer for our mine. The equipment’s efficiency and reliability have eliminated our production bottlenecks, and the local service team’s responsiveness gives us peace of mind. We plan to order two more 2JTP hoists for our new mine shaft in 2025.”
5. Conclusion
The 2JTP mine hoist’s success in Zambia demonstrates its adaptability to African mining conditions—combining high performance. For mining enterprises in Zambia and beyond, the 2JTP series offers a cost-effective, future-proof solution to enhance productivity while prioritizing safety.
For more details on customizing 2JTP hoists for your mining project, contact,bruce@wf-cn.com/WhatsApp+86 138 3921 6889